0

Loading ...
Ongoing Works

Kutaisi Logistics Center

About This Project

Kutaisi Logistics Center

Design and Build Logistic Center and Bottling Factory

Project Details

See Detailed Information

Our project is planned to be developed in two stages. The first stage involves constructing a logistics warehouse covering 25,330 m², along with all associated utility buildings. The second stage includes the construction of an additional warehouse and a bottling plant, totaling approximately 25,000 m². The structural system features socket foundations, precast concrete columns supported by steel trusses for the roof. The roofing is designed with long-span, load-bearing trapezoidal sheets, insulated with rockwool and waterproofed with a PVC membrane. The façade is composed of PIR and Rockwool panels, ensuring durability and efficient thermal performance. All design work for the facility has been completed in-house by our expert team, ensuring seamless integration and adherence to the highest standards.

Drag View Close play
0%